[Ipopt] infeasible problem

Ali Baharev ali.baharev at gmail.com
Thu Nov 27 09:34:10 EST 2008


I just multiplied all the constraints by 1.0e3 and now IPOPT runs perfectly :)

It was a scaling issue (as suspected).

Now, my original question boils down to the following. Which
parameter(s) should i change to have the same effect as multiplying
all constraints by the same constant?

Thanks,

Ali



More information about the Ipopt mailing list