[Cbc] New trunks and note on infeasibility ray.
John Forrest
john.forrest at fastercoin.com
Tue Mar 19 15:13:39 EDT 2013
Allan,
I attach a log of a run in debug mode. It is in svn. The idea is that
you set extravariables to N and if there are less than N different
costs, then up to N extra variables are created which have the objective
and are the sum of the values of the corresponding integer variables.
So the relevant lines with your problem are -
Problem has 218 integers (0 of which binary) and 0 continuous
218 integer have nonzero objective, 0 have zero objective, 8 different
nonzero (taking abs)
48 variables have objective of 1
1 variables have objective of 4
28 variables have objective of 16.29
28 variables have objective of 31.58
8 variables have objective of 233.333
35 variables have objective of 1235.43
35 variables have objective of 1430.12
35 variables have objective of 2441.3
Replacing model - 7 new variables
For your problem, it works very well.
John
On 19/03/13 18:49, acw at ascent.com wrote:
> I'm obviously interested in the -extraVariables feature (though I'd
> like some guidance on how to pick the value). Is this available now
> from svn, or am I waiting for a version to be "published"?
>
> Allan Wechsler
>
>
>
>
>
>
>
>
>
>
>
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://list.coin-or.org/pipermail/cbc/attachments/20130319/15b197ee/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: seg.log
Type: text/x-log
Size: 4469 bytes
Desc: not available
URL: <http://list.coin-or.org/pipermail/cbc/attachments/20130319/15b197ee/attachment.bin>
More information about the Cbc
mailing list